Entertainment
/ Hospitality - Major Projects Overview
|
|
|
|
|
|
|
|
Toyota
Arena
$19,943,000
HVAC Contract
750,000
SF
New
Basketball Arena
|
|
Toyota Arena
Houston, Texas
Way
Engineering Ltd. was the Mechanical Contractor
on the new 750,000 square foot Toyota Arena, home of the NBA's Houston
Rockets.
As the Mechanical Contractor on this facility, Way Engineering
was
responsible for providing and installing all of the HVAC piping, air
distribution and building management systems for this facility.
This facility was completed on schedule in September of 2003.
|
|
|
|
|
Houston
Convention Center Hotel
$8,400,000
Plumbing contract
1,200
Rooms
|
|
Houston Convention Center
Hotel
Houston, Texas
As
Prime Contractor to United Space Alliance, the Way Engineering
Design/Build Team developed and installed a 1400-ton direct expansion
retrofit with a new air-cooled, chilled water Central Plant, as well as
a one (1) million gallon thermal energy storage system, complete
with a state-of-the-art Andover DDC Control System. |
|
|
|
|
San
Antonio Spurs Arena (SBC Center)
$1,250,000
Mechanical Contract
|
|
San Antonio Spurs Arena
San Antonio, Texas
Way
Engineering Ltd. was contracted to perform the HVAC and Plumbing for the
Underground Utilities on the new arena for the San Antonio Spurs.
Way Engineering Ltd. supplied and installed the underground
mechanical utilities inside the building, including over 10,000 feet of
sanitary and grease waste collection systems and over 750 feet of
48" reinforced concrete pipe for return air duct systems. Some of
this piping was installed 15 feet below grade.
Way also installed over 4,000 feet of perimeter foundation drain
piping. |
|
|
|
|
Minute
Maid Park
$32,000,000
Mechanical contract
New
baseball park
|
|
Minute Maid Park
Houston, Texas
|
|
|
|
|
Union
Station at the Ballpark
$2,800,000
Mechanical contract
Renovation
of vintage 1911 Train Station
|
|
Union Station at the
Ballpark
Houston, Texas
|